Bolivar Industrial Park







Site Overview

Site Address:  Lucy Black Road and Municipal Plaza Road
City (where site is located):  City of Bolivar
County (where site is located):  Hardeman
Site ownership:  Public
Developable acreage:  33 acres
Additional acreage available:  15 acres
For sale or lease: Sale
Sale/Lease price: $10,000 per acre
Zoning: Industrial
Site covenants: No
Impact fees: None
Foreign trade zone: No
Distance to interstate highway: Adjacent
Rail service: Not available


Utility Service

Electric line serving site:  12.0 kV
Electric service to substation: 161 kV
Dual feed service: Not available
Natural gas service: 6 inch line / 125 psi
Water line serving site: 8 inch
Water system capacity: 4.0 MGD
Excess water system capacity: 2.8 MGD
Wastewater line serving site: 8 inch
Wastewater system capacity 1.4 MGD
Excess wastewater capacity: 400,000 GPD


Technical Studies and Reports

Two foot topgraphic survey: Available
Site grading plan/design: Not Available
Phase I ESA: Available (July 2015)
Hydrologic determination: Available
Geotechnical survey: Avalable
Flood hazard: Outside flood plain
Endangered species study: Available
Cultural resources review: Available