Cherry Glen Industrial Park

Within this master-planned industrial park, you will find numerous opportunities for a wide range of facilities.


Here, you will find 300 acres ready for development with numerous options for lot configurations. Four internal roadways and all major utilities have been extended to provide access to each available lot, ranging in size from 10 to 150 acres.






Site Overview

Site address

Hwy 43 and Sam Watkins Boulevard

City (where site is located) Mt. Pleasant
County (where site is located) Maury
Site ownership Public
Site acreage 305 acres
Developable acreage 303 acres
Additional acreage available No
For sale or lease Sale
Sale/lease price $25,000-$45,000 per acre
Zoning M-1 industrial
Site covenants Yes
Impact fees Yes
Foreign trade zone No
Distance to four-lane highway 18 miles
Rail service Not available

 

Utility Service

Electric line serving site 13 kV
Electric service to substation 46 kV
Dual feed service Available
Natural gas service 4-inch line/48 psi
Water line serving site 12-inch
Water system capacity 1.4 MGD
Excess water system capacity 650,000 GD
Wastewater line 12-inch
Wastewater system capacity 1.6 MGD
Excess wastewater capacity 300,000 GD

 

Technical Studies and Reports

Two-foot topographic survey Available
Geotechnical survey Available
Site grading plan/design Not available
Flood hazard A portion inside flood plain
Phase 1 ESA Available (December 2012)
Endangered species desktop review Available
Hydrologic determination Available
Cultural resource desktop review Available